RPAC Summer Projects • Volunteer Sign-up

Help us prepare our facilities for an exciting fall season!

Skills needed range from basic painting to cutting and installing trim to hanging a tv.


Use the comment to let us know what day and time you can help!

Text message Mr. Chris with any questions: 530-712-1007

    We picked this option for you:

    Teke Bernard

    (take home task)

    launder our mic belts and bring them back clean and organized by size.

    * Comment required
    Teke Bernard

    (take home task)

    launder our volunteer vests and bring them back clean and organized by size.

    * Comment required
    Marlana Buck

    (self-managed task)

    Prep room, touch up walls, and clean up.

    * Comment required
    Marlana Buck

    (self-managed task)

    Prep room, touch up paint, and clean up.

    * Comment required
    Camille patterson

    (self-managed task)

    Prep room, touch up paint, and clean up.

    * Comment required
    Brandon Baumann Mr. Nate Camille patterson

    (Under Brandon's direction)

    •Assist with Tool organization

    •Move items to warehouse

    •Organize storage shelves

    •Label storage, and clean room.

    * Comment required
    Camille patterson

    •Deep clean; vacuum carpet, then steam clean when finished.

    •Tidy and Organize mic table and makeup tables

    •Wipe down all cubbies

    •Move items that belong elsewhere

    * Comment required
    Camille patterson

    Cut and install ceiling tiles.

    * Comment required
    Camille patterson

    •Repair ceiling grid (one section)

    •Cut and install ceiling tiles

    * Comment required
    Camille patterson

    Use the included installation kit, no actual plumbing required, drilling two holes and following instructions.


    •Install a Y adapter on bathroom cold line

    •drill two small holes in walls for water line to pass through to main room of The Box

    * Comment required
    Camille patterson

    •Mount wood shelves onto wall

    •shelves are already cut, the support strips will need to be cut, studs found, wall anchors used (metal stud wall)

    * Comment required
    Camille patterson

    (semi skilled project)

    •Mount a 32in TV in Studio B

    •Existing wall mount kit

    * Comment required
    Camille patterson

    •Mount a 75in TV in the Conference Room

    •Existing wall mount kit

    * Comment required
    Camille patterson

    •Mount a 75in TV in the Dance Room

    •Existing wall mount kit

    * Comment required
    Camille patterson

    •mount a 24x36in mirror on the wall next to the water cooler in the studios building hallway

    * Comment required
    Camille patterson

    •mount a First Aid Kit on the wall next to the water cooler in the studios building hallway

    * Comment required
    Camille patterson

    •Measure and cut door trim, then install with a handheld battery powered finish nail gun (easy)

    * Comment required
    Camille patterson

    •Install carpet tiles and floor trim.

    •Carpet tiles will need to be cut, we are installing them using the adhesive tabs for a "floating floor"

    •Vinyl trim is just cut with a box knife and glued on using adhesive from a caulking gun tube

    * Comment required
    Stevie Hackworth

    Plumbing already in place.

    •Install P-trap, connect water supply lines, and test for leaks.

    * Comment required
    Stevie Hackworth

    Plumbing already in place.

    •Mount on wall

    •Install P-trap, connect water supply lines, and test for leaks.

    * Comment required

    •Turn off correct breaker

    •Replace thermostat following the instructions

    •Test

    * Comment required

    •Turn off correct breaker

    •Replace thermostat following the instructions

    •Test

    * Comment required

    •Turn off correct breaker

    •Replace thermostat following the instructions

    •Test

    * Comment required
    Charlie

    •Need to be familiar with this scope of project

    •Adding a 220v plug for the clothes dryer, breaker is existing, wiring is not

    •Drop ceiling

    * Comment required

    •Need to be familiar with this scope of project

    •Adding a 220v plug for the oven, breaker is existing, wiring is not

    •Drop ceiling

    * Comment required

    •Need to be familiar with this scope of project

    •4x 120v plugs on back wall of snack bar

    •2 circuits, 2 plugs for menu tvs, 1 plug for popcorn, 1 plug for refer

    •Drop ceiling

    * Comment required
    Camille patterson

    We have the tiles and glue, but will need to remove and replace aprox 6 tiles, another 3 are missing and will need to be cut and glued down

    * Comment required
    Camille patterson

    You could commit to as little as one room or as much as all of it :)


    We have several areas with missing floor trim:

    •Studio A

    •Studio B

    •Studio C

    •Studio E

    •Lobby

    •Part of Rehearsal Studio

    •Part of Dance Studio

    •Part of Conference Room

    * Comment required
    Camille patterson

    You could commit to as little as one room or as much as all of it :)


    We have several areas with missing floor trim:

    •Lobby

    •Green Room

    •Main Room

    •Bathroom

    * Comment required
    Camille patterson

    •2 Extinguishers


    Fairly easy, there is a bracket with 2 screw holes and will need to drill into concrete block and use an anchor.


    The signs also just have two screw holes

    * Comment required
    Camille patterson

    •3 Extinguishers


    Fairly easy, there is a bracket with 2 screw holes and will need to drill into concrete block and use an anchor.


    The signs also just have two screw holes

    * Comment required

    You could commit to as little as one room or as much as all of it :)


    All located in Studios Building

    •Studio A

    •Studio B

    •Studio C

    •Studio E

    •Both Bathrooms

    •Copier Room

    •Rehearsal Studio

    * Comment required
    Current Responses
    Wash & Organize: Mic Belts:
    Teke Bernard Thursday 2:00 pm (after voice lesson 😉)
    Wash & Organize: Volunteer Vests:
    Teke Bernard Thursday 2:00 🤓
    *Painting: Studios building lobby:
    Marlana Buck Wednesday all day
    *Painting: Studios building Restrooms:
    Marlana Buck Wednesday all day
    *Painting: Theatre building Restrooms:
    Camille patterson Open availability
    *Organization: Blue Room:
    Brandon Baumann all day every day
    Mr. Nate tues-fri till 5
    Camille patterson Open availability
    *Organization: Green Room (Theatre Building):
    Camille patterson Open availability
    Project: Ceiling Tile Installation (Copier Room):
    Camille patterson Open availability
    Project: Ceiling Tile Installation (Snack Bar):
    Camille patterson Open availability
    Project: Install Water Cooler (The Box):
    Camille patterson I haven’t done this before, but I’d be willing to lend a hand moving it and learn more
    Project: Mount shelving in Janitorial Closet:
    Camille patterson Open availability
    Project: Mount a TV (Studio B):
    Camille patterson Open availability
    Project: Mount TV (Conference Room):
    Camille patterson Open availability
    Project: Mount TV (Dance Room):
    Camille patterson Open availability
    Project: Mount a Mirror on a wall:
    Camille patterson Open availability
    Project: Mount a First Aid Kit on a wall:
    Camille patterson Open availability
    Project: Install Door Trim:
    Camille patterson Open availability
    Project: Install Carpet Tiles (Studio E):
    Camille patterson Open availability
    Project: Install Utility sink (Copier Room):
    Stevie Hackworth wed & thur
    Project: Install Handwashing sink (Snack bar):
    Stevie Hackworth wed & thur
    Project: Install 220v / 30a dryer plug (Copier Room):
    Charlie tues june 30
    Project: Replace a couple of missing/loose VCT Tiles:
    Camille patterson Open availability
    Project: Install Vinyl floor trim (Studios Building):
    Camille patterson Open availability
    Project: Install Vinyl floor trim (The Box):
    Camille patterson Open availability
    Project: Hang Fire Extinguishers and Signs (The Box):
    Camille patterson Open availability
    Project: Hang Fire Extinguishers and Signs (Studios Building):
    Camille patterson Open availability